The welding technology of SPV-355 boiler and pressure steel plate
Production Weld TestsProduction weld test plates shall be welded for SPV-355 boiler and pressure steel plate primary-component butt-welded shell plates when welding procedure qualifications are required to be impact tested per Q.6.2 and Q.6.3. The number of production weld tests shall be based on the requirements of Q.6.6.3 and Q.6.6.4. The locations impact tested (i.e., HAZ and/or weld deposits) shall likewise be the same as required for weld procedure qualifications per Q.6.2 and Q.6.3. Weld testing shall be in accordance with Q.6.6.5. Test plates shall be made from plates produced only from the heats that are used to produce the shell plates for the large welded steel tank.
When providing technical services on site, the after-sales personnel shall strictly abide by the safety rules and regulations of the construction site, consciously take safety protection measures (such as wearing safety helmet when entering the construction site), accept the supervision and management of the site; without permission on the construction site, they shall not dismantle, smear or damage any goods; the commissioning of contract goods shall be carried out under the supervision of the site supervisor If necessary, it shall be approved by the site supervisor or the person in charge of the project department.
The finned tube heating device for high temperature heat transfer oil for large SPV-355 boiler and pressure steel plate has the advantages of convenient inspection and maintenance. The high-efficiency fin heating coil assembly is composed of spirally arranged finned coils. The fins are mainly arranged in the straight pipe section, and the whole assembly is supported by several angle steel supports. The high-efficiency fin heating coil component can enter and exit from the manhole of the SPV-355 boiler and pressure steel plate, which is convenient for maintenance and repair.
The company always adheres to the concept of green production, follows the development path of innovation, transformation and improvement, and has carried out in-depth cooperation with Zhengzhou University and other scientific research institutes, planning from a high starting point, strict standard design, and successfully implementing engineering projects With nearly 20 research and development projects, the company's production technology and equipment are at the forefront of the industry, and indicators such as environmental protection, energy consumption, cost, and resource utilization have reached the advanced level in the industry.
Leave a Comment